Abstract:In order to solve the problem of dam foundation leakage, the CSM construction method of double-wheel milling deep mixing cement soil continuous wall was adopted in the risk alleviation and reinforcement project in Futuan Gate in Rizhao, to fully mix the cement slurry and the weathering rock at the bottom, targeting to form the effect of seepage and water sealing effectively. Through the application of CSM construction method, the dam foundation leakage problem is effectively solved, and the water storage capacity of rubber dam is improved.