Abstract:At present, the state continues to strengthen the protection of ecological environment, so that the sewage discharge standards are becoming increasingly strict, and the backward sewage treatment technology needs to be upgraded. This paper aims to analyze the process of sewage treatment process of a municipal sewage treatment plant in Zibo, puts forward the idea of upgrading the standard for carrying out process design and engineering construction, and further improving the effluent quality. The analysis shows that the wastewater treatment plant has some problems such as high risk of exceeding the effluent quality, poor disinfection effect and high sludge moisture content. The original process was upgraded by adopting the new technology of "Fenton oxidation reaction + powder activated carbon adsorption +magnetic coagulation precipitation +V -type filter treatment process". The data analysis for one year after the project was completed and put into operation shows that, compared with the original process, the effluent quality COD, SS, total phosphorus, total nitrogen, ammonia nitrogen, chroma and other indexes of the upgraded effluent quality are reduced by morethan 14.7%, and the efluent quality reaches the "quasi-IV" standard of surface water. The process upgrading of the wastewater treatment plant has achieved remarkable benefits, and can provide reference for similar wastewater treatment process upgrading.