Abstract:In accordance with the major strategic deployment of accelerating the construction of a national modern water grid, the requirements of the construction of the pilot area of the national provincial water grid, the distribution of natural rivers and lakes, the endowment of water resources, the layout of the national economy, and the current water projects, in Shandong Province, it aims to improve its water security capability comprehensively, and focuses on improving the optimal allocation system of water resources, the flood control and disaster reduction system, as well as the water ecological protection and restoration system. Strengthen the connection and interconnection with the national backbone network, coordinate the current stock and increment, scientifically demonstrate and put forward the overall pattern of "one axis with three rings, seven vertical and nine horizontal, two lakes and multiple reservoirs" provincial water grid, through legal protection, improve new quality productivity, continuous innovation and other strategies. Accelerate the deep integration of modern water grid construction with ecological environmental protection, rural revitalization, transportation, cultural tourism, and industrial development in Shandong, further give full play to the overall efficiency and comprehensive benefits of the water grid, and effectively play a leading role in the national modern water grid planning and construction.