新建水库施工度汛规划要点分析
DOI:
CSTR:
作者:
作者单位:

山东省水利勘测设计院有限公司,山东济南 250013

作者简介:

栾荣章(1979-),男,高级工程师

通讯作者:

中图分类号:

TV697

基金项目:


Analysis of Key Points on Flood Control Planning of Newly-built Reservoirs Construction
Author:
Affiliation:

Shandong Survey and Design Institute of Water Conservancy co., Ltd, Jinan, Shandong 250013 , China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    新建水库工程库区占地面积大,施工周期长,施工期间需要确保水库自身、库区及下游各类建筑物筑物和人民群众安全度汛。水库建设过程中由于受各种因素制约易导致水库度汛方案与原设计方案发生变化,因此,需要高度重视施工度汛,合理规划,施工中更要重视动态调整,确保施工期度汛安全。

    Abstract:

    The reservoir area of a newly-built reservoir project covers a large area and has a long construction period. During the construction period, it is necessary to ensure the safe flood control of the reservoir itself, various buildings and structures in the reservoir area and downstream, as well as the safety of the people. During the construction of the reservoir, it is restricted by various factors, resulting in changes in the reservoir flood control plan compared with the original design plan. Therefore, it is necessary to attach great importance to construction flood control, make reasonable planning, and pay more attention to dynamic adjustment to ensure the safety of flood control during the construction period.