Abstract:The Anxing River is the main irrigation and flood drainage river in the northern part of Mudan District, Heze Municipality. After years of operation, the current river channel of the upper reach is severely silted up, and the original embankments are damaged, which seriously affects the exertion of the project's benefits. This paper introduces the general situation of the Anxing River and its upper reach, analyzes the geological and hydrogeological conditions of the project area, and furthermore elaborates on the tasks of river channel dredging and embankment restoration. The paper also presents the experience and practices in details such as organizational arrangement, requisition and relocation and removal of obstacles, environmental protection, quality supervision, safety supervision, civilized construction sites, and project archives management during the project implementation process, and analyzes the benefits achieved by the project.