Abstract:Taking the Water Diversion to Jiaodong Project as a case,this paper deeply analyzes the current challengesand problems in the process of safely hidden danger investigation and control of the prgject. In response to theseproblems, a series of refined management modes are proposed, aiming to achieve synchronous advancement throughmeasures such as technological innovation, management optimization, and personnel training. These measures canimprove the accuracy and efliciency of hidden danger investigation, accelerate the response speed of goverance, andstrengthen the implementation intensity,so as to ensure that the safety hidden danger of the water diversion project arecontrolled and disposed of in a timely and effective manner, providing reference for the safely hidden danger investigationand control of similar water diversion projects.