Abstract:Seepage discharge is an important indicator for monitoring the stability of plain reservoir projects and a keycharacteristic parameler for studying the actual water storage capacily of reservoirs. By discussing the constructionstructure and engineering management of Jihongtan Reservoir, analyzing the plain reservoir dam, water diverting anddischarge structures, water drainage, and seepage observation, this paper studies the basic conditions and factorsalfecting the seepage discharge of the reservoir, According to the analysis results of the actual seepage situation of thedam, the approximate value of the seepage discharge of the plain reservoir is solved by section and layer using hydrauliccalculation methods and impact factor methods, Necessary statistical experience corrections are made based on rainfalland runoff monitoring and water diversion and supply calcularion to obtain the corrected approximate value. Thecorrected value is integrated into the digital twin scenario application through a computer platfor, and the correctedseepage discharge value is used to guide the safely and water regulation management of the reservoir project.