Abstract:The Yantai Section of the Water Diversion to Jiaodong Area Project features a wide variety of structures, a long route, and heavy tasks, making the safe operation of the project quite challenging. Taking this section as an example, this paper discusses the construction method of the "Six Mechanisms", implementing full-process and all-round control over dangerous events during project operation. This effectively curbs and prevents the occurrence of various accidents, providing a reference for the construction of the "Six Mechanisms" in other water diversion projects.