Abstract:To solve the problems of engineering space conflict in the cross section of tunnel and highway in water diversion projects, this study analyzes the specific situation of the cross project between Hou Touping Tunnel and Mianxi Expressway. It considers the site selection conditions and existing technical conditions comprehensively, puts forward the layout scheme and construction technical route of the inverted siphon, and analyzes in detail the key technical points such as pile foundation protection construction, earth and rock excavation, and slope anchor-shotcrete soil nailing wall construction. The results show that the inverted siphon technology can effectively solve the technical problems in cross projects, and reasonable design and construction methods can ensure the stability and safety of the structure, providing references for the complex construction environment of water projects.