Abstract:A comprehensive flood control system consisting of embankments, danger elimination works, river regulation works and flood storage and detention areas including Dongping Lake Reservoir has been completed. In terms of non-engineering measures, the capabilities of forecast, early warning, pre-scheme and pre-drill have been continuously improved. An integrated information perception network has been established, and a "1+N" flood prevention and emergency rescue mechanism has been put into operation. The system has achieved remarkable results and successfully coped with multiple severe flood events. Nevertheless, further efforts are required to optimize the flood control system, including river regulation and dredging, reservoir operation optimization, management of flood detention areas, improvement of early warning mechanisms and professional flood control team building. Systematic upgrading will enhance overall flood resistance capacity and support to realize the target of building the Yellow River into the Happy River Program for benefiting the people.